OPT, New Caledonia
New Caledonia
Hyber Power for Offgrid Telecom Stations
Office des Postes & Telecommunications (OPT) in New Caledonia needed a renewable energy system to supply power at their Cap Sommet wireless network site.
From energy generation to energy storage, the AEG PS hybrid power ecopx installation offered substantial operating costs reductions, security, reliability and a sizeable carbon footprint improvement. The system offers a combination of solar and wind energy with batteries and has a genset (diesel generator) as backup.
OPT was fully satisfied with the AEG PS solution, which resulted in the award of a contract for another site.
AEG PS distribution partners have access to exclusive product documentation and training materials.
To the partner portal