SOLAR AND WIND ENERGY FOR OPT NEW CALEDONIA

OPT, New Caledonia

Location

New Caledonia

Application

Hyber Power for Offgrid Telecom Stations

Solution
  • ECOpx hybrid power supply

Office des Postes & Telecommunications (OPT) in New Caledonia needed a renewable energy system to supply power at their Cap Sommet wireless network site.

 

From energy generation to energy storage, the AEG PS hybrid power ecopx installation offered substantial operating costs reductions, security, reliability and a sizeable carbon footprint improvement. The system offers a combination of solar and wind energy with batteries and has a  genset (diesel generator) as backup.

 

OPT was fully satisfied with the AEG PS solution, which resulted in the award of a contract for another site.